

Home charging
7 kW Home Charging Station
The ideal power for most homes: a full charge overnight on a classic single-phase installation.
RYVOLT · Sélection
Our products

Why 7 kW?
The majority of homes are single-phase. In this case, 7.4 kW is the maximum useful power: it's the best balance between charging speed and installation cost.
Expect about 40 to 50 km of range recovered per hour of charging, depending on your vehicle.

What you need to install it
A dedicated 32 A electrical line, protected by a suitable circuit breaker and RCD. The installation must be done by a qualified electrician (IRVE in France to benefit from grants).
Also check that your electricity subscription supports this power in addition to the household's consumption.

Compatible with your car?
All our stations use the Type 2 plug, the European standard present on almost all electric cars. If your car accepts less than 7 kW, it will simply charge at its own limit.
RYVOLT · FAQ
Frequently asked questions
How long does it take to charge with a 7 kW station?
Approximately 6 to 9 hours for a 50 to 60 kWh battery, i.e., overnight. The exact time depends on your vehicle.
Is three-phase required for a 7 kW station?
No. A 7 kW station works on single-phase, the most common installation in homes.
Is there a charge for delivery?
No, delivery is free: 48h maximum in France, 3 to 5 working days in the rest of the EU.
